Fraunhofer’s Mechanical Room on their first floor housed equipment that produced a significant amount of heat including:  a boiler, condensate return system with tanks and pumps, heat transfer package, heat exchanger, valve, fittings, pipe and a pressure reducing station.   The enclosure did not have proper ventilation and the temperatures in the room exceeded acceptable values.  Three separate recommendations were presented to relieve conditions that including repetitive short circuiting.